Had some back luck?? Ran into a careless forklift operator that raised the freight too high inside the trailer, put 2 holes in the top of the trailer, like the size of a coke can. Urgh and ouch!
No need to be grouchy just yet, it really isn't that bad. With a master technician, it only takes 2 hours of labor plus $100 worth of material. Plus travel time depends on how far we need to go to the trailer.
コメント